Our Location
Coimbatore,
Tamilnadu ,
India

Check keys, approvals, warranties, meter readings, fixtures, drainage and defect records at handover.
Before accepting a newly built house, inspect every room, door, window, floor, wall, roof, bathroom, kitchen, electrical point, plumbing fixture and drainage outlet. Test taps, flushes, switches, sockets and doors.
Collect approved drawings, applicable completion / occupancy documents, structural and service records, warranties, manuals, utility account details, keys and access cards. Record meter readings and outstanding defects with photographs and agreed rectification dates.
For an apartment, also obtain association details, common-area handover information, maintenance dues and parking allocation documents. Have serious defects reviewed by qualified professionals.
No article-specific official source was identified in the source draft. Confirm claims with the relevant government department or a qualified local professional before publication.
Publication control: This is an informational draft, not a legal, engineering, tax or financial opinion. Check the current official source, applicable rules and exact property jurisdiction. Record the date checked and retain the source document or written confirmation. Where a decision affects title, approvals, structural safety, tax or statutory compliance, obtain review from the competent authority or a suitably qualified professional.