Our Location
Coimbatore,
Tamilnadu ,
India

Understand the online TNPDCL service options, documents to prepare and checks before applying for a new connection.
A new electricity service connection is an essential step when moving into a newly built house or setting up a commercial property. The application type depends on the property, load, tariff category and whether the connection is temporary, low tension (LT) or high tension (HT).
For a typical home, the applicant generally needs to review the applicable LT domestic service category. Commercial and industrial premises may require a different tariff and load assessment. Construction sites may need a temporary connection. Do not select a category solely based on a neighbour's bill.
TNPDCL's online services include new connection options, including LT and temporary connections, and separate services for existing connections. Use the official TNPDCL website and select the current service matching your requirement.
The portal may request applicant details, service address, ownership or occupancy evidence, load details, wiring / licensed contractor information and other supporting records. Exact requirements depend on the service category and current rules. Follow the live application checklist.
Before energisation, ensure the internal installation is designed and tested by an appropriately qualified electrical professional. The connected load, earthing, protective devices, wiring and meter location must meet applicable requirements.
Submit through the official portal, save the acknowledgement and application number, and pay charges only through authorised channels. Track status and respond to inspection or clarification requests.
Check the consumer number, sanctioned load, tariff category, meter details and billing address. Keep the service documents safely. Apply through official channels for name transfer, load change or tariff change when needed.
Coimbatore tip: Confirm the local section office and service jurisdiction for the exact premises. A property address and a nearby landmark may not be enough to identify the correct service area.
Important: Charges, documents, timelines and eligibility can change. Always use the current official TNPDCL application guidance.
TNPDCL official online services portal.
Publication control: This is an informational draft, not a legal, engineering, tax or financial opinion. Check the current official source, applicable rules and exact property jurisdiction. Record the date checked and retain the source document or written confirmation. Where a decision affects title, approvals, structural safety, tax or statutory compliance, obtain review from the competent authority or a suitably qualified professional.